09 - 12 September, 2019 |
Singapore

Conference Day 2 - Wednesday, 5th September 2018

8:00 am - 8:50 am Morning Refreshment & Registration

8:50 am - 9:00 am Opening Remarks from Chairperson

David Hartell - Senior Development Manager, Premier Oil
img

David Hartell

Senior Development Manager
Premier Oil

9:00 am - 9:40 am Deploying FPSOs In Marginal Fields – Past, Present and Future Trends

Jon Fredrik Muller - Partner & Head of Consulting Asia-Pacific, Rystad Energy
  • Reviewing the number of FPSOs deployed in marginal fields within the last five years
  • Analysing future trends of deploying FPSOs in marginal fields in the next 3 to 5 years
  • Examining the case for deploying FPSOs in marginal fields and determining some of the considerations for field owners and operators
img

Jon Fredrik Muller

Partner & Head of Consulting Asia-Pacific
Rystad Energy

9:40 am - 10:20 am Case-Study 1: MTC Ledang FPSO - Delivering An FPSO Conversion Project On Time And Within Budget

Mohd Fauzi Ya’akob - Chief Executive Officer, MTC GROUP
Mohd Roslan Daut - General Manager Development, MTC GROUP
The Ophir oil field offshore Malaysia is being developed via three production wells, a well head platform (WHP) and floating production storage and offload (FPSO) vessel. Conversion works were done on the oil tanker, Puteri Bangsa, by Keppel Shipyard and the completed FPSO, MTC Ledang FPSO, will be contracted to be at the Ophir field for a period of three years, with a one-year extension option. The FPSO will have a small process facility module with capacity for 15,000 barrels of fluid per day and gas flaring and will be capable of storing up to 350,000 barrels of crude. It will be anchored to the seabed at the Ophir field and connected to the Ophir platform via a flexible 8” pipeline. In this session, vessel owner MTC Engineering will share its experience converting the FPSO and how it overcame all the challenges to deploy the project on time and within budget.
img

Mohd Fauzi Ya’akob

Chief Executive Officer
MTC GROUP

img

Mohd Roslan Daut

General Manager Development
MTC GROUP

10:20 am - 10:40 am Speed Networking

This focused 20-minute activity will allow you to connect with other FPSO professionals in a brief, personal and structured format. Use this opportunity to make new contacts, exchange business cards and plan further conversations throughout the 2 days of the FPSO World Congress 2018 to maximise your networking opportunities, and have some fun while at it!

10:40 am - 11:10 am Morning Tea & Networking Break


11:10 am - 11:50 am Case-Study 2: Armada Kraken FPSO – Challenges Deploying An FPSO For Heavy Oil Production

Michael Duddy - Vice-President, Fleet Asset Integrity, Bumi Armada
The Armada Kraken FPSO, which is currently operating in the Kraken field in the UK North Sea, completed the offloading of its first cargo on 12 September 2017. This is Bumi Armada’s first foray into heavy oil production and has the largest liquid-handling capacity in its fleet at 460,000 barrels of liquid per day. In this session, vessel owner Bumi Armada will share the challenges it faced constructing the vessel, how it overcame tight deadlines and also key lessons learnt in project execution, maintenance and operations.   
img

Michael Duddy

Vice-President, Fleet Asset Integrity
Bumi Armada

11:50 am - 12:30 pm How IoT And Digital Solutions Will Help Optimise Construction And Operations Of FPSOs

Vincent Jacquemet - Oil and Gas Digital Consulting Director, Schneider Electric
As the industry responds to the disruption of 2014 and we are settling into the new norm of the $50 barrel price recovery, oil and gas production companies are embracing new FPSO greenfield projects and the operations of existing ones with a new mind-set to remain profitable.

Digital transformation has raised as a “new” creative solution to transform FPSO asset lifecycle, from engineering and design to operations and maintenance.
Industry figures show that only about 1% of data actually gets used. IIOT applied to the Digital FPSO overcomes the traditional approach to keeping operations silo`d and independent from each other, towards integration. Digitalization is enabling the capture and transfer of tribal knowledge and best practices from individuals to organizations to enable decision making.

During this session we will explore how a digital architecture enables transformation by unlocking data value – from Digital Twin to operations, asset management, predictive maintenance and 3d virtual technology training, analytics deliver measurable improvements that result in CapEx and OpEx savings.

img

Vincent Jacquemet

Oil and Gas Digital Consulting Director
Schneider Electric

A group of experienced financiers will be on stage to kick-off a 20 mins discussion on whether the FPSO industry is still an attractive sector to invest in. During this session, delegates can post questions anonymously on a message board through the FPSO Network application. The financiers will then spend the next 40 mins answering these questions.
img

David Hartell

Senior Development Manager
Premier Oil

img

Shiv Sivarajah

Director of Natural Resources
ING Bank Asia

img

Jon Fredrik Muller

Partner & Head of Consulting Asia-Pacific
Rystad Energy

Klaus Schmidberger

Vice President
KfW IPEX-Bank GmbH

img

Siddharta Shrivastava

Head of Energy & Natural Resources
Sumitomo Mitsui Banking Corp

img

Erwin de Villeneuve

Director, Energy, APAC
ABN AMRO Bank B.V.

1:00 pm - 2:00 pm Lunch & Networking Break


STREAM C FPSO Construction & Project Execution

2:00 pm - 2:30 pm Achieving Maximum Production Potential Through Advanced Analytics
Petter Dramstad - Head Business Development, Offshore Oil & Gas, Siemens
  • Identifying the drivers of digital solutions for FPSOs and determining the current level of adoption
  • Examining the various possible implementation of Digital Solutions available for the FPSO industry
  • Studying the impact of digital FPSO solutions on CAPEX and OPEX and how it can help prepare for market recovery

Petter Dramstad

Head Business Development, Offshore Oil & Gas
Siemens

STREAM C FPSO Construction & Project Execution

2:30 pm - 3:00 pm FLNG EPCIC Experiences Following The Past FPSO/Onshore LNG Projects Achievements
Keiji Tanigawa - General Manager, Offshore Project Development Department,, JGC CORPORATION
  • Overview of JGC’s past FPSO EPCIC contract achievements
  • Examining the similarities between FPSO and FLNG EPCIC job scope, requirements and expertise needed
  • Case-study of an recently concluded FLNG EPC contract and how FPSO contractors and EPCs can tap on existing expertise
img

Keiji Tanigawa

General Manager, Offshore Project Development Department,
JGC CORPORATION

STREAM D FPSO Operations, Asset Integrity and Decommissioning

2:00 pm - 2:30 pm Next-Gen FPSOs: Incorporating A Sustainable Integrated Intelligence Operations (IIO) Framework For FPSOs
David Hartell - Senior Development Manager, Premier Oil
  • Leveraging on IIO to improve the operational safety of FPSOs
  • Examining the infrastructure needed to implement an IIO framework for an oil field
  • Discussing the barriers that could hinder the implementation of a IIO framework and how to tackle them
img

David Hartell

Senior Development Manager
Premier Oil

STREAM D FPSO Operations, Asset Integrity and Decommissioning

2:30 pm - 3:00 pm Working Group Challenge: How Do You Increase Safety, Reduce Downtime And Lower Costs In FPSO Crew And Cargo Transfer?
Sandra Antonovic - Chief Operating Officer, Reflex Marine

img

Sandra Antonovic

Chief Operating Officer
Reflex Marine

3:00 pm - 3:30 pm Afternoon Tea & Networking Break


3:30 pm - 4:00 pm OnshoreMAXSuperscript- Significantly Reducing CAPEX For FPSO/FLNG Project Through Topside Module Design and Dry Dock Integration

Li Qiuzhe - Deputy General Manager, Qingdao McDermott Wuchuan Offshore Engineering Co Ltd

img

Li Qiuzhe

Deputy General Manager
Qingdao McDermott Wuchuan Offshore Engineering Co Ltd

4:00 pm - 4:30 pm New Built Hull Strategy and How This Affects FPSO Project Execution Timelines

Alexander Guntert - Delivery Manager, BW Offshore

img

Alexander Guntert

Delivery Manager
BW Offshore

3:30 pm - 4:30 pm Examining The Impact Of Increased Infill Drilling On New FPSO Demand And Operations

Ir. Dr. Adrian Tan - Engineering Manager, Hibiscus Petroleum

img

Ir. Dr. Adrian Tan

Engineering Manager
Hibiscus Petroleum

4:30 pm - 4:40 pm Intermission


4:40 pm - 5:20 pm Closing Plenary Session: Understanding The Key Takeaways From The FPSO World Congress - How Will We Shape Our Businesses For 2018 And Beyond?

David Hartell - Senior Development Manager, Premier Oil
  • Understanding key takeaways from the FPSO World Congress 2018
  • Ensuring business sustainability in the next 3 years as more FPSO projects get tendered
  • Implementing strategies to reduce upfront costs and increase FPSO productivity
  • Innovating as an industry to apply new technologies that can radically improve FPSO productivity and reduce costs
img

David Hartell

Senior Development Manager
Premier Oil

5:20 am - 5:30 am Chairman’s Closing Summary and End of Congress