04 - 05 September, 2018 |
Marina Bay Sands, Singapore, Singapore

Ir. Dr. Adrian Tan


Engineering Manager
Hibiscus Petroleum


4:00 PM Examining the Impact of Increased Infill Drilling on New FPSO Demand & Operations

-           Understanding the concept of infill drilling and why it is preferred by oil operators to increase and accelerate production at existing oil fields
-           Analysing the impact and length of an FPSO deployment in a field due to increased infill drilling
-           Discussing how infill drilling to increase oil recovery, FPSO productivity and reduce CAPEX and OPEX 


Check out the incredible speaker line-up to see who will be joining Ir. Dr. Adrian.

Download The Latest Agenda